We are a developing gold mining and mineral recovery operation based in Zimbabwe focused on sustainable gold production, tailings recovery, and strategic artisanal mining partnerships. The project is supported by grassroots exploration work, geomagnetic survey reports, bottle roll test results, and fire assay laboratory analysis. With an existing 28-meter shaft already producing gold at small scale level, our vision is to build a fully integrated gold recovery ecosystem combining mining operations, advanced processing infrastructure, and innovative recovery systems designed for long-term growth and profitability.
About Sections
Existing Gold Mining Project
- Grassroots exploration completed
- Geomagnetic survey reports available
- Existing 28m shaft
- Existing gold-bearing belt
- Bottle roll & fire assay results available
- Current small-scale gold production
Our Vision
To establish a scalable and sustainable gold recovery operation capable of supporting artisanal miners while maximizing gold recovery through advanced processing systems and strategic partnerships.
Why Our Model Is Different
- Multiple income streams
- Tailings recovery strategy
- Existing artisanal partnerships
- Processing infrastructure development
- Low-grade ore recovery
- Scalable recovery operations
History
- (ATM NTOBE D) Dambrige Block 1 & (ATM NTOBE B) Dambrige Block 2 were discovered in Oct 2016 at Dambridge area in Silobela, Midlands Province in Zimbabwe through desk studies, area selection, land acquisition and preliminary community engagement for gold mining. Block 1 & 2 are 2km apart, with different belts.
- Furthermore, regional studies (geology, survey, geo magnetic geophysics) were carried out on grassroots exploration of geo magnetic survey for gold in Nov 2016.
- After when the survey was conducted, there was community engagement and the Zibagwe Rural Council involvement for approval to setup a gold processing plant. In Dec 2016, a letter of approval was issued out by the Zibagwe Rural District Council and payment was done.
- The gold mine documents certificate of registration were issued out in Sep 2019 at the Ministry Of Mines in Gweru under the Mines & Minerals Act.
- Mining operations started in Sep 2020, by sinking standard shafts at block 1 & block 2.
- At block 2, the belt was reached at the depth of 16m. Geochemistry 3 samples were conducted at Antech Laboratories in Kwekwe on Oct 2020 for dumps & rock chips. View the geochemistry lab results above.
- A tunnel was open at 18m following the belt up to 28m and then funds ran out to continue.
- At block 1, the shaft is 9m, no belt found.
- All the belts were traced from adjacent mines that are currently producing high volumes of gold through the geo magnetic survey.
Executives
Keith Thabani Mpofu (Director)
- Keith Thabani Mpofu is the core founder of (ATM NTOBE D) Dambrige Block 1 & (ATM NTOBE B) Dambrige Block 2.
- There is only one director in the company at the moment, hoping to get more directors, investors & share holders in the future.